1. Cost Composition (Typical Project)
Cost Factor |
Small Batch (1-10pcs) |
Mass Production (100+pcs) |
---|---|---|
Material (T700) |
40% of total |
25% of total |
CNC Programming |
15% |
3% (amortized) |
Labor (Post-Processing) |
25% |
12% |
Tooling/Waste |
20% |
10% |
2. 3 Cost-Saving Strategies
A. Design Optimization
B. Material Selection
C. Order Planning
3. Case Study: Automotive Sensor Housing
▸ Prototype Phase (5pcs): $280/unit
▸ Production Phase (200pcs): $89/unit
4. When to Choose Small Batch?
✓ Functional testing ✓ Market validation ✓ Premium products <100 units/yr
Request Custom Quote: